 |
printer-friendly
version
The Recycling Process
Here's How The Process Works
|
|
A pulverizer rips up the old asphalt and base. |
|
|
A grader brings the road to the desired grade, making it passable
for temporary traffic. |
|
|
Next, a truck spreads a prescribed amount of cement over the
pulverized road base. |
|
|
Hooked up to a water truck, the pulverizer mixes the cement,
water and pulverized roadway down to a depth of 6 to 10 inches. |
|
|
The base is compacted, cured, and topped with a riding surface,
usually a chip seal or hot-mix asphalt. |
Text and Photos courtesy of Portland Cement Association www.portcement.org
|
|